Request For Quotation

Engineer My System / Request for Quotation

( * ) Please fill in all required fields.

* Name:   
* Title:   
   Company:   
* Address:   
* City:   
* State:   
* Zip Code:   
* Country:   
* Phone:   
   Fax:   
* Email:   
   
Project Status:  
   Purchase within 30 Days
   Purchase 30-90 Days
   Budgetary /Planning stage

 

FEED WATER CONDITIONS
Conductivity:pH:
NH4:  CO2:  
K:  CO3:  
Na:  HCO3  
Mg:  NO3:  
Ca:  Cl-  
Ba:  F:  
Sr:  SO4:  
Fe:  PO4  
Fe (tot):  Mn:  
SiO2(colloidal):  SiO2(soluble):  
Other Ions:
TDS:
TOC:
BOD:
COD:
Total Alkalinity (m-value):
Carbonate Alkalinity (p-value):
Total Hardness:
Turbidity (NTU):
Silt density index (SDI):
Bacteria (count/ml):
1.What is the source of the feed water? Surface Well Sea

Other

2.Is the sourceMunicipal

Private

Other
3.Is there a history of seasonal fluctuations in the water source or water quality?
4.Is there Chlorine present in the feed water supply? Yes

No

If yes, what is the concentration, mg/l.
5.What is the feed water temperature?   °C.
6.Does the feed water temperature vary? Yes

No

If yes, what is the range?
°C to °C.
7.Is the raw water feed volume limited?Yes

No

If yes, to what flow?
8.Is Hydrogen Sulfide (H2S) present? Yes NoIf so, in what concentration level?
9.Does the feed water have any color?YesNo
10.What is the feed water pressure?PSI BarMaximum Minimum

 

SYSTEM SIZING

 

1.What is the daily volume of product water required per day? M3/day, GPD.
2.What is the volume of product required per hour? M3/HR, GPH.
3.If possible, project future product water requirements 1-3 years from now. M3/HR, GPH.
4.How many hours per day is product water required?
How many days per week?

5.What are the product water quality (level of purity) requirements?
Please describe in as much detail as possible.
6.Does the product water quality need to meet any specific standard like US EPA, WHO, ASTM, USP, WFI, Etc.? Please describe in detail.
7.What is maximum number of days the R.O. system will not be in operation?

 

INSTRUMENTATION

 

1.Are there any special control or instrumentation requirements?Yes No
2.Does this application require digital outputs for data transmission to a remote computer or monitor?YesNoIf yes, please describe in detail.

 

SITE CONDITIONS

 

1.Where will the reject water from the R.O. system go?
2.How much space is available for this system?LengthWidthHeight
3.What is the maximum door size opening?Width Height
4.What is the available electrical power? Volts
Phase
Hertz Amps
5.What is the electrical cost per KWH?U.S. dollarsOther
6.What is the cost of the water to be treated? per M3.
7.What environment will the system be located? IndoorOutdoor
8.What are the atmospheric conditions to which the System will be exposed? (Example: corrosive, damp, dusty, hazardous/explosive fumes or dust, extreme heat, etc.)Please describe:
9.What is range of the ambient air temperature variations? °C to
°C
10.What is the approximate date that this system is required to be in operation?
11.If engineering specifications and/or drawings are available, please provide a copy.
12.Are there storage facilities for the product water? Yes   NoIf yes, what is the capacity?
M3, Gallons.
Material type?
13.How many hours per day is the facility staffed?
14.Is this a constant or intermittent duty application?
15.What is the anticipated product water PSI requirement?
16.Describe the overall application:

 

 

 

Send mail to webmaster@sbigroup.co.za with questions or comments about this web site.
Copyright © 2010 Shiebrook International c.c.
Last modified: 11/25/10
Hosted By -